Dummy frames were fixed temporarily in place
for the patio doors, wall plates were strapped to the inner
skin blockwork and structural timbers fixed in place for the
flat roof.
Insulation and osb sheets were fixed on top of the timbers
and roof insulation, with mineral felt and stone chippings
to finish. Soffits and fascia board were fixed all round.
Guttering and downpipe fed into the new soakaway for surface
water.
|